ive never seen this guy post anything even remotely sensible, but i think ive read every one of his posts. entertainment is entertainment.
bp leaked doc
Download site MEGAUPLOAD - The leading online storage and file delivery service
it was SABOTAGE
* EDS (emergency disconnect) button was pushed
* EDS would have started hydraulic rams that would have sealed the flow of oil - this would have sealed in 30-50 secs
* The ROV(robotic vehicle) down there has inspected the EDS and has identified UNDOCUMENTED MODIFICATIONS TO THE HYDRAULIC CONTROL SYSTEMS
IMO these modification stopped the ADS shuttin off the flow of oil.
I repeat
UNDOCUMENTED MODIFICATIONS TO THE HYDRAULIC CONTROL SYSTEMS
Page 4: Critical Factors.
1. Loss of integrity of 9 7/8" x 7" casing created a path for hydrocarbon (HC) influx.
2. Unrecognized well conditions.
A. Influx unrecognized, integrity test failed to identify communication with the reservoir.
B. Operation allowed HC influx to enter and move up the well bore, well became capable of flowing.
C. Response failed to close the well.
3. BOP and Emergency systems failed to isolate the HC source.
4. Gas Plume Ignited.
page 37