Is this Broad Ripple?
So is it cheaper for a chopper lift then a crane? Faster?
The crane that was on site to set the pre-cast walls was taken down last week. There is no longer a crane on site that could do that. And like HS said, it would take too long to set it up and move, etc. There was the stipulation that no one was allowed to work in the building while they were flying those in on the roof, though.
Fastest, best pilot I ever seen... check him out!
[video=youtube;08K_aEajzNA]https://www.youtube.com/watch?v=08K_aEajzNA[/video]
And from inside the cabin if ya don't get queasy....
[video=youtube;SPO9pVwoxVg]https://www.youtube.com/watch?v=SPO9pVwoxVg[/video]