Look at all that Red Sweat coming our way from the south!
They claim the track can be Dry in 70 minutes now with the Air Titan 2.0 from Nascar they have on hand.Race is most likely going to start late - like 3 or 4 p.m.. We'll see if they can get 101 laps in before the second line of storms comes in.
I was a little busy cooking or eating with family when this posted, but sometimes, I call the plumber just to save down time in case something goes wrong.No, I'm affording them a very lucrative living apparently! He replaced a valve. $555. I replaced a valve and a supply line. ~$30. I just didn't trust myself to do this main valve correctly. I'm sure I could have, but I didn't want to take the chance.